One Odoo core replaced four systems and cut month-end close from nine days to two
A three-plant manufacturer ran production, inventory, accounts and maintenance on four disconnected systems. We consolidated them into a single Odoo core with plant-floor data capture, cutting month-end close from nine days to two.
- Client
- Rieco Industries
- Region
- Ahmedabad, India
- Timeline
- 5 months to go-live
- Team
- 7 specialists
9 → 2 days
Month-end close cycle
4 → 1
Systems of record
31%
Reduction in unplanned downtime
100%
Transactions with real-time costing
Context
The situation we found
Process-equipment manufacturer with three plants and 480 employees
Engagement model: Fixed-scope implementation + AMC
Order-to-cash spanned a legacy accounting package, two spreadsheets-of-record and a homegrown production tracker. Costing was reconstructed manually after the fact, so leadership never saw true job profitability inside the quarter.
Challenge
What was blocking the business
The constraints that had to be resolved before any technology decision mattered.
Approach
How we solved it
The decisions that produced the outcome, not a feature list.
Process discovery before configuration
Four weeks of on-site mapping across plants produced a single validated process model and a clean item and BOM master.
Odoo as the operational core
Manufacturing, inventory, purchase, sales, accounting and maintenance modules configured against the agreed model, with custom costing rules.
Shop-floor data capture
Tablet-based work order confirmation and barcode movement so WIP and consumption post in real time rather than at week's end.
Compliance automation
GST-ready invoicing, e-invoice generation and audit trails built into the transaction flow instead of bolted on at filing time.
Delivery roadmap
How the programme ran
- 01
Discovery & process model · 4 weeks
Plant walkthroughs, data audit, target process design and migration plan.
- 02
Core configuration · 8 weeks
Odoo modules, costing rules, chart of accounts and role-based access.
- 03
Data migration & UAT · 5 weeks
Master data cleansing, opening balances, parallel run and user training.
- 04
Go-live & hypercare · 4 weeks
Phased cutover by plant, on-site support and stabilisation.
Results
What changed after go-live
Measured in the client's own systems against the baseline captured in discovery.
Client view
In their words
“KoderClub replaced four disconnected systems with one Odoo core in five months. Month-end close went from nine days to two.”
Rajesh Menon
Chief Operating Officer, Rieco Industries
Stack & integrations
What it was built on
Technology stack
Integrations
Capabilities used
Services and platforms behind this work
FAQ
Questions about this engagement
Related case studies
Other engagements worth reading
A multi-currency trading platform gave a Dubai distribution group 18% more margin visibility
A GCC distribution group priced deals without knowing landed cost. We built a multi-currency trading platform that computes landed cost and true margin at quote time across six countries and four currencies.
An AI triage assistant cut patient intake time by 42% across nine hospitals
A nine-hospital network was losing outpatient capacity to manual intake. We built a clinician-supervised AI triage assistant that structures symptoms, routes to the right department and pre-fills the EMR — cutting intake time by 42%.
Facing something similar in manufacturing?
Share your current systems and constraints. We will return an approach, phased plan and the outcome metrics we would commit to — under NDA.
Request a proposal for manufacturing
Share your current systems and constraints. A senior consultant responds within one business day, under NDA.